New & replacement septic systems
Septic System Installation in Oklahoma City
Building on acreage inside OKC, or replacing a system that has failed? The soil decides which systems are allowed, DEQ approves the design, and the lot has to have room for it. Here is how the process works.
Step 1: Check the lot
Oklahoma's minimum lot size for a home on septic is typically half an acre with public water and three-quarters of an acre with a private well. OSU Extension suggests planning about 10,000 square feet, roughly a quarter acre, for the system itself, with room for equipment to get in (PSS-2411). Every part of the system has to sit on your property or in a recorded easement, with set separation distances from wells, property lines and buildings.
If the lot is within 300 feet of a reservoir or stream in one of DEQ's Water Body Protection Areas, the rules require an aerobic system with a nitrogen-reducing component, which costs more. Ask the DEQ office about this before you buy land near water.
Step 2: Test the soil
The soil test sets the size and type of system. There are two kinds:
- Soil profile description. The texture and color of the soil are examined at 6-inch intervals down to 48 to 54 inches, or until a limiting layer such as rock or a water-saturated zone. It opens up the most system options.
- Percolation test. Measures how fast water moves into the soil at the depth where effluent would go. It can only be used to design a conventional system.
Soil profiles are done by DEQ environmental specialists or by DEQ-certified soil profilers. Some Oklahoma municipalities want the soil test report before they will issue a building permit, so do this early.
Step 3: Choose the system the soil allows
| System | Where it fits | Trade-off |
|---|---|---|
| Conventional (tank and laterals) | Deeper, medium-textured soil and enough room | No electricity, least maintenance; not allowed in the heaviest clays |
| Aerobic with spray | Tight clay, shallow rock, smaller areas | No soil test required; needs power, chlorine and twice-yearly checks |
| Aerobic with drip | Similar sites where surface spray is not wanted | No chlorine needed; drip lines 8 to 10 inches deep; higher install cost |
| Lagoon | Larger rural lots | Low tech; must be fenced and kept up, and takes a lot of space |
| ET/A or shallow extended | Specific soil and climate conditions | Need a soil profile; less common in the metro |
System types from OSU Extension PSS-2919; soil and drip details from PSS-2275.
Around Oklahoma City, clay is the usual deciding factor, which is why most new systems in the metro are aerobic.
Step 4: Get the Authorization to Construct
All new installations and all modifications need an Authorization to Construct from DEQ before work starts. The installer normally prepares and files it. If the installer is DEQ-certified, they inspect their own work; if not, DEQ has to inspect the system before anything is backfilled or turned on. You can look up installers on DEQ's on-site sewage program pages or call DEQ at (405) 702-6100.
Step 5: Install, then maintain
Installation is usually a few days of work on site once the permit and equipment are ready, with weather the main variable; clay that is soaked from spring rain cannot be trenched or backfilled properly. If you install an aerobic system, the installer has to maintain it free for the first two years. Plan for aerobic maintenance after that, and budget using our Oklahoma City septic cost guide.
New system questions
Do I need a soil test for a septic system in Oklahoma?
For most systems, yes. A soil profile description or a percolation test sizes the system. A percolation test can only be used for a conventional system. Lagoons and aerobic systems with spray irrigation do not require a soil test, though a soil profile is still the best place to start.
Who issues septic permits in Oklahoma City?
The Oklahoma Department of Environmental Quality. Every new installation, and every modification of an existing system, needs an Authorization to Construct from DEQ before work begins. The installer usually files the application for you.
What is the minimum lot size for a septic system in Oklahoma?
Typically half an acre if the home uses public water from a city or rural water district, and three-quarters of an acre if it uses a private well. As a rule of thumb, set aside about 10,000 square feet for the system itself.
Can I install my own septic system in Oklahoma?
State rules allow a non-certified installer to install a system, but only one per year, and DEQ has to inspect the work before it is backfilled or put into use. Systems installed by a DEQ-certified installer are self-inspected by the installer.
Why does my builder want an aerobic system instead of a lateral field?
Usually because of the soil. Tight clay drains too slowly for a conventional field, and the heaviest clay soil group does not allow one at all. Aerobic systems pre-treat the water so it can be sprayed or dripped onto a smaller area.
Start with the lot and the soil
Send us the address area, the acreage and whether you have a soil test. We will tell you what to expect before anything is dug.